How long does it take to build a prefabricated house with a timber load-bearing structure?
Construction to the advanced shell stage, for a building of approx. 150 m2, takes approx. 20–25 days. The assembly of the structural part of the building (walls, floor structure, roof structure) takes 1–2 days, depending on the complexity of the house and the site conditions.